TM-9-2350-261-20-3 Unit Maintenance Manual Volume 3 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 437 of 936
TM 9-2350-261-20-3 REPLACE LEFT BULKHEAD RADIO STOWAGE RACKS (M577A2 AND M1068 ONLY) — Continued 0533 00 INSTALLATION 1. Align three intercom brackets (1) with rack (2). Secure with six screws (3) and new locknuts (4). 2. Align racks (5) and (2) with front and rear bulkhead lugs. Secure with two screws (6), four new lockwashers (7), and two new locknuts (8) on each rack. 3. Align racks (5) and (2) to left bulkhead lugs. Secure with screw (9), washer(s) (10) (to shim), two new lockwashers (11), and new locknut (12) on each rack. 4. Align racks (5) and (2) with left bulkhead lug. Secure with screw (13), two new lockwashers (14), and new locknut (15). 5. Align hanger (16) with hull top plate lug. Secure with screw (17), two new lockwashers (18), and new locknut (19). 6. Align hanger (16) with rear rack (2) and front rack (5). Secure with screw (20), two new lockwashers (21), and new locknut (22). FOLLOW-THROUGH STEPS 1. Start engine (see your -10). 2. Raise and lock ramp (see your -10). 3. Stop engine (see your -10). END OF TASK 0533 00-3/4 blank