TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 890 of 1012
TM 9-2350-261-20-2 BLEED PIVOT STEER SYSTEM — Continued 0409 00 6. After bleeding, add FRH hydraulic fluid only as needed. Fluid level should be within 1/2-3/4-in (13-9 mm) from top of cylinder. Do not overfill (WP 0120 00). TEST AND INSPECTION 1. Pull control handle to applied position and hold it there. If handle continues to move after applied position is reached, master cylinder, hose, tube, or connection is bad. Repair or replace bad parts (WP 0412 00). FOLLOW-THROUGH STEPS 1. Close power plant front access door and raise trim vane (see your -10). 2. Raise and lock ramp (see your -10). 3. Operate carrier (see your -10). Check that pivot steer system operates properly. 4. Stop/shutdown engine (see your -10). END OF TASK 0409 00-2