TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 831 of 1012
TM 9-2350-261-20-2 REPLACE UPPER ACCELERATOR PEDAL ASSEMBLY — Continued 0396 00 INSTALLATION 1. Install guide (1) on power plant compartment. Secure with four screws (2). 2. Install two ball bearings (3) and springs (4) in pedal detent block (5). Secure with two set screws (6). 3. Install two nuts (7) on two set screws (6). 4. Install plunger (8) and spring (9) in pedal detent block (5). 5. Install pedal detent block (5) on pedal (10). Secure with two screws (11) and locknuts (12). 6. Use spring scale to adjust detent plunger (WP 0401 00). Use pressure to 35-40 pounds (16-18 kg). 7. Install pedal assembly (10) in guide (1). 8. Place bellcrank (13) and woodruff key (14) on pedal assembly (10) shaft. Tighten nut (15). 9. Install link (16) on bellcrank (13). Secure with screw (17) and new locknut (18). 10. Connect return spring (19) to bellcrank (13). FOLLOW-THROUGH STEPS 1. Install lower accelerator pedal (WP 0395 00). 2. Install driver’s power plant access panel (WP 0430 00). 3. Install driver’s seat (WP 0478 00). 4. Close power plant front access door and raise trim vane (see your -10). 5. Raise and lock ramp (see your -10). 6. Start engine (see your -10) 7. Check that upper accelerator pedal operates properly. 8. Stop/shutdown engine. END OF TASK 0396 00-3/4 blank