TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 824 of 1012

TM 9-2350-261-20-2 REPLACE DIFFERENTIAL CROSS-SHAFT LINKS — Continued 0393 00 CLEAN, INSPECT, AND REPAIR 1. Check link rods. Replace cracked, bent, or broken links. 2. Check link clevises. Replace links with cracked or worn mounting holes. 3. Check clevis pins. Replace worn or grooved clevis pins. 4. Check springs. Replace cracked or worn springs. INSTALLATION 1. Install two links (3) to differential steering levers (4) and differential cross-shafts (5). Secure with four clevis pins (2) and new cotter pins (1). 2. Adjust linkage (WP 0387 00). 3. Connect two return springs (WP 0387 00). FOLLOW-THROUGH STEPS 1. Close power plant front access door and raise trim vane (see your -10). 2. Operate steering levers to check that differential cross-shaft links operate properly. END OF TASK 0393 00-2