TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 580 of 1012

TM 9-2350-261-20-2 REPLACE TRAILER HARNESS — Continued 0328 00 INSPECTION-ACCEPTANCE AND REJECTION CRITERIA 1. Check receptacle. Repair or replace cracked or broken receptacle (WP 0313 00). INSTALLATION 1. If removed, install spring (1) and elbow (2) in ramp. 2. If removed, install connector (3) in rear bulkhead. 3. Route leads (4) through new gasket (5), and out through elbow (2). 4. Install gasket (5), receptacle (6), and cover (7) on ramp. Secure with four screws (8). 5. Route leads (4) through spring (1) and connector (3). 6. Install circuit 90 lead (9) between clamp (10) and weldnut on hull. Secure with two new lockwashers (11) and screw (12). 7. Install shell connectors on leads (4) (WP 0314 00). 8. Connect leads (4) to leads (13). FOLLOW-THROUGH STEPS 1. Install rear floor plates (WP 0436 00). 2. Connect battery ground lead (WP 0294 00). END OF TASK 0328 00-2