TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 576 of 1012
TM 9-2350-261-20-2 REPLACE BILGE PUMP CIRCUIT BREAKERS — Continued 0327 00 INSTALLATION 1. Install two circuit breakers (1) and (2) in distribution box (3). Secure with four screws (4) and new locknuts (5). 2. Connect circuit 450C lead (6) and circuit 450B lead (7) to top bilge pump circuit breaker (2). 3. Connect circuit 450A lead (8) and circuit 450 lead (9) to bottom bilge pump circuit breaker (1). 4. Inspect gasket (10). Replace if damaged. 5. Place master switch panel (11) on distribution box (3). Secure with eight screws (12), washers (13), and new locknuts (14). FOLLOW-THROUGH STEPS 1. Connect battery ground lead (WP 0294 00). 2. Turn MASTER SWITCH to ON (see your -10). 3. Turn on bilge pump switches (see your -10). 4. Turn all switches OFF (see your -10). END OF TASK 0327 00-2