TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 34 of 1012

TM 9-2350-261-20-2 REPLACE DEAERATION ELBOW TO RADIATOR INLET ELBOW COOLANT TUBE — Continued 0198 00 INSTALLATION 1. Secure insulation (1) to coolant tube (2) with two clamps (3). 2. Secure bracket (4) to bulkhead with screw (5), washer (6), and new locknut (7). 3. Place clamp (8) on coolant tube (2). Secure clamp to bracket (4) with screw (9), washer (10), and new locknut (11). 4. Secure hose (12) to radiator inlet elbow (13) and coolant tube (2) with two clamps (14). 5. Secure hose (15) to coolant tube (2) and deaeration elbow (16) with two clamps (17). FOLLOW-THROUGH STEPS 1. Fill cooling system (WP 0194 00). 2. Start engine (see your -10). Check for leaks. 3. Stop/shutdown engine (see your -10). 4. Install driver’s power plant access panel (WP 0430 00). 5. Install power plant rear access panel (WP 0431 00, WP 0432 00, or WP 0433 00) 6. Close power plant front access door and raise trim vane (see your -10). END OF TASK 0198 00-2