TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 295 of 1012
TM 9-2350-261-20-2 REPLACE DISTRIBUTION BOX ASSEMBLY FOR 200 AMP GENERATOR SYSTEM (M113A2 AND M1064 ONLY) 0270 00 THIS WORK PACKAGE COVERS: Removal (page 0270 00-1). Installation (page 0270 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0780 00, Item 29) M a t e r i a l s / P a r t s Sealing compound (WP 0782 00, Item 66) Gasket Grommet (8) Lockwasher (6) Lockwasher (5) P e r s o n n e l R e q u i r e d Unit Mechanic E q u i p m e n t C o n d i t i o n Engine stopped/shutdown (see your -10) Carrier blocked (see your -10) Battery ground lead disconnected (WP 0294 00) Master switch panel assembly removed (WP 0222 00) REMOVAL 1. For M113A2 carrier, remove screw (1), lockwasher (2), circuit 6 lead (3), and circuit 6L lead (4) from bus bar (5). Remove circuit 6 lead, circuit 6L lead, and two grommets (6) and (7) from distribution box (8). Discard grommets and lockwasher. 2. For M1064 carrier, remove screw (1), lockwasher (2) and circuit 6 lead (3) from bus bar (5). Remove circuit 6 lead and grommet (6) from distribution box (8). Discard grommet and lockwasher. 3. Remove screw (9), lockwasher (10), circuit 10, 14, 15, and 27E lead (11), and circuit 450A lead (12) from bus bar (5). Remove circuit 10, 14, 15, and 27E lead and grommet (13) from distribution box (8). Discard grommet and lockwasher. 4. Remove screw (14), lockwasher (15), and circuit 49 lead (16) from bus bar (5). Remove circuit 49 lead and grommet (17) from distribution box (8). Discard grommet and lockwasher. 0270 00-1