TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 289 of 1012

TM 9-2350-261-20-2 REPLACE DISTRIBUTION BOX ASSEMBLY FOR 100 AMP GENERATOR SYSTEM (M113A2, M1064, AND M1059 ONLY) 0269 00 THIS WORK PACKAGE COVERS: Removal (page 0269 00-1). Installation (page 0269 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0780 00, Item 29) M a t e r i a l s / P a r t s Sealing compound (WP 0782 00, Item 66) Gasket Grommet (8) Lockwasher (6) Lockwasher (5) P e r s o n n e l R e q u i r e d Unit Mechanic E q u i p m e n t C o n d i t i o n Engine stopped/shutdown (see your -10) Carrier blocked (see your -10) Battery ground lead disconnected (WP 0294 00) Master switch panel assembly removed (WP 0222 00) REMOVAL 1. For M113A2 and M1059 carriers, remove screw (1), lockwasher (2), circuit 6 lead (3), and circuit 6L lead (5) from bus bar (4). Remove circuit 6 lead, circuit 6L lead, and two grommets (6) and (7) from distribution box (8). Discard grommets and lockwasher. 2. For M1064 carriers, remove screw (1), lockwasher (2), and circuit 6 lead (3) from bus bar (4). Remove circuit 6 lead and grommet (6) from distribution box (8). Discard grommet and lockwasher. 3. Remove screw (9), lockwasher (10), circuit 10, 14, 15, and 27E lead (11), and circuit 450A lead (12) from bus bar (4). Remove circuit 10, 14, 15, and 27E lead and grommet (13) from distribution box (8). Discard grommet and lockwasher. 4. Remove screw (14), lockwasher (15), and circuit 49 lead (16) from bus bar (4). Remove circuit 49 lead and grommet (17) from distribution box (8). Discard grommet and lockwasher. 0269 00-1