TM-9-2350-261-20-2 Unit Maintenance Manual Volume 2 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 281 of 1012
TM 9-2350-261-20-2 REPLACE DISTRIBUTION BOX ASSEMBLY FOR 100 AMP GENERATOR SYSTEM (M577A2 ONLY) — Continued 0267 00 11. Install new grommet (1) and circuit 10, 14, 15, and 27E lead (2) in distribution box (3). Install circuit 10, 14, 15, and 27E lead (2) and circuit 450A lead (4) on bus bar (5). Secure with new lockwasher (6) and screw (7). 12. Install two new grommets (8) and (9), circuit 49 lead (10), and circuit 6 lead (11) in distribution box (3). Install circuit 49 lead (10) and circuit 6 lead (11) on bus bar (5). Secure with new lockwasher (12) and screw (13). 13. Install new grommet (14) and circuit 415 lead (15) in distribution box (3). Install circuit 415 lead (15) on bus bar (5). Secure with new lockwasher (16) and screw (17). 0267 00-5