TM-9-2350-261-20-1 Unit Maintenance Manual Volume 1 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 972 of 1236
TM 9-2350-261-20-1 REPLACE FUEL RETURN HOSES, TUBES, AND FITTINGS (M1064 ONLY) — Continued 0152 00 30. Install nipple (1) with nut (2) on transverse beam inside power plant rear bulkhead. 31. Connect tube assembly (3) to nipple (1). 32. Install elbow (4) on tube assembly (3). 33. Install quick disconnect half (5) on elbow (4). 34. Connect fuel return hose (6) to nipple (1). 35. Connect quick disconnect half (7) to quick disconnect half (5) at power plant rear bulkhead. FOLLOW-THROUGH STEPS 1. Fill fuel tanks (see your -10). 2. Connect battery ground lead (WP 0294 00). 3. Start engine (see your -10). Check for leaks. 4. Install power plant rear access panel (WP 0433 00). 5. Install heater duct (WP 0617 00). 6. Install floor plates (WP 0437 00). 7. Raise and lock ramp (see your -10). 8. Stop/shutdown engine (see your -10). 9. Unblock carrier (see your -10). END OF TASK 0152 00-10