TM-9-2350-261-10 Operator Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 585 of 764
TM 9-2350-261-10 BREAK/JOIN T130 TRACK 0078 00 THIS WORK PACKAGE COVERS: Break T130 Track (page 0078 00-1). Join T130 Track (page 0078 00-5). INITIAL SETUP: M a i n t e n a n c e L e v e l Operator T o o l s a n d S p e c i a l T o o l s C row bar ( WP 0 094 0 0, Table 2, Item 11) D rive Pin Pu nch (W P 00 94 00 , Tab le 2, Item 3 7) G rease Gun (WP 009 4 00, Table 2, Item 24) Hamm er, 2 lb (W P 0094 00, Table 2, Item 25) Sock et, 1 1/1 6 inch (WP 009 4 00, Table 2, Item 43) Socket Handle, Wrench 1/2 inch drive (WP 0094 00, Ta ble 2, I tem 28) Track Fixture ( 2) (WP 0 094 0 0, Table 2, Item 21) Wrench, Adjustable, 1-5/16 inch (WP 0094 00, Table 2, Item 57) P e r s o n n e l R e q u i r e d Driver Crew R e f e r e n c e s DA Form 2404 WP 0026 00 WP 0028 00 WP 0029 00 WP 0050 00 WP 0076 00 E q u i p m e n t C o n d i t i o n Engine stopped (WP 0029 00) BREAK T130 TRACK 1. Unstow crowbar and track fixtures from rear top deck. Remove hammer from tool bag. 2. Start engine (WP 0026 00). 3. Drive carrier to firm level ground (WP 0028 00). 0078 00-1