TM-9-2350-261-10 Operator Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 547 of 764

TM 9-2350-261-10 PREVENTIVE MAINTENANCE CHECKS AND SERVICES — Continued 0075 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 74 Weekly Engine Exhaust System NOTE Check for exhaust leaks only after engine reaches normal operating temperature of 160 to 230 F (71.1 to 110 C). Carrier leaks exhaust gas when cold. For this reason, carbon will be present around joints and exhaust pipe connecting clamps. This is normal. The exhaust system joints will seal after pipes heat up. a. Check complete exhaust system for deterioration, damage, or evidence of exhaust leakage at connection points. Look for weld failures and loose or missing hardware. Notify unit maintenance of defects. Any part missing, damaged, improperly aligned, or insecurely mounted. 0075 00-99 º º º º