TM-9-2350-261-10 Operator Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 492 of 764

TM 9-2350-261-10 PREVENTIVE MAINTENANCE CHECKS AND SERVICES — Continued 0075 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: NOTE On the majority of the heater control boxes, the control light comes on dimmed during the start cycle of the heater. When heater starts the light goes to full brightness. c. Push the PRESS-TO-TEST light cover. Make sure indicator light comes ON before you start heater. Make sure HI-LO switch is on before you start heater. 0075 00-44