TM-9-2350-261-10 Operator Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 320 of 764
TM 9-2350-261-10 CAPSTAN AND ANCHOR KITS (M113A2 ONLY) — Continued 0051 00 4. Stow two cable assemblies, six nylon ropes, six shackles, and one round tapered pin (fid) in stowage tarpaulin on carrier top deck. 5. Fasten three stowage tarpaulin straps and use tapered pin (fid) to tuck nylon ropes into stowage tarpaulin. 6. Secure stowage tarpaulin to top deck of carrier with four straps. END OF TASK 0051 00-8