TM-9-2350-261-10 Operator Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 317 of 764
TM 9-2350-261-10 CAPSTAN AND ANCHOR KITS (M113A2 ONLY) — Continued 0051 00 10. Apply power slowly until ground anchors are embedded and carrier starts forward motion. 11. Continue forward motion until carrier is clear and mobile. 12. After carrier is clear and mobile, steer to the right or left to create slack in the opposite rope to be removed. 13. Stop carrier (WP 0029 00). 14. Remove two shackles and nylon ropes from ground anchors. 15. Remove nylon ropes from capstan drums. RECOVER ANCHORS 1. Start engine (WP 0026 00). 2. Release steering levers. Pull back on both levers so lock buttons pop up, then ease the levers all the way forward. 0051 00-5