TM-9-2350-247-20-3 Unit Maintenance Manual Volume 3 M548A1 M548A3 Tracked Cargo Carrier Download
Page 637 of 832
TM 9-2350-247-20-3 REPLACE NOZZLES, TUBES, AND FITTINGS (NEW CONFIGURATION) 0524 00 THIS WORK PACKAGE COVERS: Removal (page 0524 00-1). Installation (page 0524 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0542 00, Item 57) M a t e r i a l s / P a r t s Lock nut (3) P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) Driver’s seat raised (see your -10) Battery negative lead disconnected (WP 0292 00) Center seat raised (see your -10) REMOVAL 1. Remove two nozzles (1) from tube (2) and tube (3). 2. Remove three lock nuts (4), washers (5), and screws (6) that secure three clamps (7) to carrier bulkhead. Discard lock nuts. 3. Remove tube (2) from tee (8). 0524 00-1