TM-9-2350-247-20-3 Unit Maintenance Manual Volume 3 M548A1 M548A3 Tracked Cargo Carrier Download

Page 570 of 832

TM 9-2350-247-20-3 REPLACE FLASHER — Continued 0509 00 INSTALLATION 1. Place new gasket (9) and bar (6) on inside of carrier. Secure with two screws (7) and new lock washers (8) from outside of carrier. 2. Place flasher (2) on bar (6). Secure with ground lead (5), three new lock washers (4), and two screws (3). Install one washer on each side of ground lead terminal. 3. Connect harness lead (1) to flasher (2). FOLLOW-THROUGH STEPS 1. Check flasher for proper operation. END OF TASK 0509 00-2