TM-9-2350-247-20-3 Unit Maintenance Manual Volume 3 M548A1 M548A3 Tracked Cargo Carrier Download
Page 473 of 832
TM 9-2350-247-20-3 REPLACE HOIST/STOPS/SLING 0484 00 THIS WORK PACKAGE COVERS: Removal (page 0484 00-1). Disassembly (page 0484 00-2). Assembly (page 0484 00-3). Installation (page 0484 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0541 00, Item 57) M a t e r i a l s / P a r t s Cotter pin Lock nut (2) Cotter pin P e r s o n n e l R e q u i r e d Unit Mechanic Helper (H) R e f e r e n c e s See your -10 TB 43-0142 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) REMOVAL 1. Remove sling (1) from hoist chain hook (2). Remove strap (3) and release chain (4) from bow support (5). 2. Remove two screws (6), lock nuts (7), washers (8), and four beam end stops (9) from beam (10). Discard lock nuts. 3. Loosen trolley lock handle (11). 0484 00-1