TM-9-2350-247-20-3 Unit Maintenance Manual Volume 3 M548A1 M548A3 Tracked Cargo Carrier Download

Page 170 of 832

TM 9-2350-247-20-3 REPLACE WINCH POWER TAKEOFF CONTROL (M548A1) — Continued 0414 00 4. Thread outer control cable (1) through power plant compartment and bulkhead. Secure control cable to compartment floor with clamp (10), washer (11), and screw (12). 5. Place range selector in NEUTRAL (see your -10). 6. Push inner control cable (13) through range selector housing (4) and winch control handle (14). Push winch control handle against range selector housing and turn handle a quarter turn to lock it. Tighten nut (2). 7. Push power takeoff actuating lever (15) as far forward as it will go. Bend outer control cable (1) so you can put end through setscrew (16). Do not tighten setscrew. 8. Install bracket (17) and nut (18) on screw (19). Tighten nut. Install and tighten jam nut (20). 9. Tighten setscrew (16). FOLLOW THROUGH STEPS 1. Install cab center floor plate (WP 0394 00). 2. Connect battery negative lead (WP 0292 00). 3. Install left grille (WP 0390 00). 4. Lower center seat (see your -10). 5. Install power plant rear access covers/door (see your -10). Install power plant rear access covers/door (see your -10). END OF TASK 0414 00-4