TM-9-2350-247-20-3 Unit Maintenance Manual Volume 3 M548A1 M548A3 Tracked Cargo Carrier Download

Page 167 of 832

TM 9-2350-247-20-3 REPLACE WINCH POWER TAKEOFF CONTROL (M548A1) 0414 00 THIS WORK PACKAGE COVERS: Removal (page 0414 00-1). Cleaning (page 0414 00-2). Installation (page 0414 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0541 00, Item 57) Socket Wrench Set (WP 0541 00, Item 63) Torque Wrench (WP 0541 00, Item 67) M a t e r i a l s / P a r t s GAA grease (WP 0542 00, Item 14) Grommet P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) Left grille removed (WP 0390 00) Center seat raised (see your -10) Cab center floor plate removed (WP 0394 00) Power plant rear access covers/door removed (see your -10) Battery negative lead disconnected (WP 0292 00) REMOVAL 1. Loosen setscrew (1) that secures outer control cable (2) to power takeoff actuating lever (3). 2. Remove jam nut (4), nut (5), and bracket (6) that secure outer control cable (2) to screw (7). Pull control cable from bracket. 3. Remove screw (8), washer (9), and clamp (10) that secure outer control cable (2) to power plant compartment. 0414 00-1