TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download
Page 990 of 1072
TM 9-2350-247-20-2 REPLACE PIVOT STEERING BRAKE ASSEMBLY (M548A1) — Continued 0373 00 7. Install new preformed packing (1) in quick disconnect coupler (2). Install coupler on hose (3) and elbow (4). Connect quick disconnect coupler. 8. Fill hydraulic cylinders (5) and hydraulic system with hydraulic fluid (see your PMCS) (WP 0128 00). Check for leaks. 9. Operate hand lever (6) and hand lever (7) and bleed pivot steering brake control lines (WP 0370 00). FOLLOW-THROUGH STEPS 1. Start engine (see your -10). 2. Check pivot steering brake assembly for proper operation. 3. Stop engine (see your -10). 4. Install cab left floor plate (WP 0394 00). 5. Install throttle floor plate (WP 0394 00). 6. Lower right and left center seat floor plates (WP 0394 00). END OF TASK 0373 00-4