TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download

Page 902 of 1072

TM 9-2350-247-20-2 REPLACE T150 TRACK SHOE PAD — Continued 0359 02 INSTALLATION 1. Install stud (4) of track shoe pad (1) through track shoe (2) from under track and install new lock nut (3) on stud. 2. TIGHTEN LOCK NUT (3) TO 120-150 LB-FT (162-293 N·M) TORQUE. Use torque wrench. FOLLOW-THROUGH STEPS 1. Unblock vehicle (see your -10). 2. Road test vehicle to check that track shoe pad is installed correctly (WP 0128 00). END OF TASK 0359 02-2 Change 1