TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download
Page 846 of 1072
TM 9-2350-247-20-2 REPLACE TORSION BAR ANCHOR — Continued 0350 00 INSTALLATION 1. Place torsion bar anchor (2) on hull mount. 2. Install two screws (1) in anchor (2). TIGHTEN SCREWS TO 320-330 LB-FT (434-447 N·M) TORQUE. Use torque wrench. FOLLOW-THROUGH STEPS 1. Install torsion bar (WP 0349 00). 2. Install power plant for first and second torsion bar anchor (WP 0130 00 or WP 0131 00). 3. Install road wheel (T130) (WP 0361 00) or (T150) (WP 0361 01). 4. Road test carrier (WP 0128 00) to check that torsion bar anchor is installed properly. END OF TASK 0350 00-2 Change 1