TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download

Page 664 of 1072

TM 9-2350-247-20-2 ADJUST TOW START CONTROL CABLE ASSEMBLY (M548A3) — Continued 0311 00 2. Push control cable assembly handle to full in position. Move control lever (4) to obtain 0.00 - 0.06 inch (0.00 - 0.15 cm) clearance between contact surface of lever and transmission tow start button (5). Make sure cable housing end (6) to lever (4) distance is a minimum of 2.50 inches (6.35 cm). Loosen clamp (7) and adjust as required. 3. Position two collars (2) against clevis pin (8) and tighten two setscrews (1). FOLLOW-THROUGH STEPS 1. Install center floor plates (WP 0395 00). 2. Lower center seat (see your -10). END OF TASK 0311 00-2