TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download
Page 493 of 1072
TM 9-2350-247-20-2 REPLACE BILGE PUMP CIRCUIT BREAKER 0268 00 THIS WORK PACKAGE COVERS: Removal (page 0268 00-1). Installation (page 0268 00-2). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0541 00, Item 57) M a t e r i a l s / P a r t s Lock nut (2) P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) Driver’s seat raised (see your -10) Center seat raised (see your -10) Battery negative lead(s) disconnected (WP 0292 00) Left front battery removed (WP 0290 00) or (WP 0293 00) REMOVAL NOTE Circuits 450, 450A, and related circuit breaker are inactive. 1. Disconnect circuit 450B (1) and 450C (2) leads from bilge pump circuit breaker (3). 2. Remove two screws (4), lock nuts (5), and circuit breaker (3) from bulkhead. Discard lock nuts. 0268 00-1