TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download

Page 491 of 1072

TM 9-2350-247-20-2 REPLACE CIRCUIT BREAKER 0267 00 THIS WORK PACKAGE COVERS: Removal (page 0267 00-1). Installation (page 0267 00-1). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0541 00, Item 57) P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) MASTER SWITCH OFF (see your -10) Instrument panel partially removed (WP 0256 00) REMOVAL NOTE Instrument panel switches, indicators, and controls will vary between the M548A1 and M548A3. M548A1 instrument panel is shown. 1. Disconnect circuit 10 lead (1) and circuit 27 lead (2) from circuit breaker (3). 2. Remove two nuts (4) and screws (5) that secure circuit breaker (3) to bracket mount (6) on back of speedometer (7). Remove circuit breaker (3) from bracket mount (6). INSTALLATION 1. Place circuit breaker (3) on bracket mount (6) on back of speedometer (7). Secure with two screws (5) and nuts (4). 2. Connect circuit 27 lead (2) and circuit 10 lead (1) to circuit breaker (3). 0267 00-1