TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download
Page 427 of 1072
TM 9-2350-247-20-2 REPLACE GENERATOR (M548A3) — Continued 0246 00 INSTALLATION 1. If installing replacement generator, remove lock nut (1) and washer (2) from generator (3). Install key (4), pulley (5), washer (2), and lock nut (1), in that sequence on generator shaft. Tighten lock nut to 70-75 lb-ft (95-102 N•m). 2. Position generator (3) on mount (6). Have helper assist. Secure with two screws (7), three washers (8), and two new lock nuts (9). Do not tighten until drive belt is adjusted. 3. Secure turnbuckle (10) to generator (3) with screw (11), washer (12), spacer (13), and two washers (14). 4. Connect ground lead (15) to generator (3). Secure with new lock washer (16) and nut (17). 5. Connect wiring harness (18) to generator (3). FOLLOW-THROUGH STEPS 1. Install and adjust generator drive belts (WP 0245 00). 2. Connect both battery negative leads (WP 0292 00). 3. Start engine (see your -10). 4. Check generator output for proper operation. 5. Stop engine (see your -10). 6. Install hull bottom access cover (WP 0383 00). 7. Install power plant rear access panel (see your -10). END OF TASK 0246 00-3/4 blank