TM-9-2350-247-20-2 Unit Maintenance Manual Volume 2 M548A1 M548A3 Tracked Cargo Carrier Download

Page 196 of 1072

TM 9-2350-247-20-2 REPLACE AIR BOX HEATER (M548A1) — Continued 0189 00 9. Remove nozzle (16) from air box heater (2). INSTALLATION 1. Install nozzle (1) in air box heater (2). 2. Install new preformed packing (3) and new gasket (4) on air box heater (2). 3. Install air box heater (2) on engine. Secure with two screws (5) and washers (6). 4. Install three ground leads (7) on air box heater (2). Secure with screw (8) and washer (9). 5. Install adapter (10), elbow (11), and adapter (12) in air box heater (2). 6. Connect air supply hose (13) to adapter (10). 0189 00-2