TM-9-2350-247-20-1 Unit Maintenance Manual Volume 1 M548A1 M548A3 Tracked Cargo Carrier Download
Page 745 of 870
TM 9-2350-247-20-1 REMOVE/INSTALL POWER PLANT (M548A3) — Continued 0131 00 INSTALLATION WARNING Damaged lifting slings can fall with load. Personnel can be injured or killed. Inspect all slings. Do not use damaged slings. 1. Inspect sling for damage (WP 0443 00). C A U T I O N Trunnion cap and spacer can get damaged. Make sure trunnion and spacer are positioned and installed correctly before you install mounting bolts. NOTE Make certain transmission aligning ring is installed in groove in lower half of right transmission mount or transmission trunnion. 2. Attach sling to power plant lifting points, making sure shackle is in hole stamped B. WARNING Lifting sling may slip and allow power plant to drop. Personnel may be injured. Be sure sling is firmly attached and maintains engine support. 3. Slowly lift and position power plant on its mounts inside carrier. 0131 00-9