TM-9-2350-247-20-1 Unit Maintenance Manual Volume 1 M548A1 M548A3 Tracked Cargo Carrier Download

Page 721 of 870

TM 9-2350-247-20-1 REMOVE/INSTALL POWER PLANT (M548A1) — Continued 0130 00 17. Remove fuel cutoff cable from power plant. a. Loosen two setscrews (1) that secure control cable (2) in two collars (3) and stop lever (4). b. Remove two screws (5) and lock nuts (6) that secure control cable (2) in clamp (7). Remove cable from power plant. Discard lock nuts. 0130 00-9