TM-9-2350-247-20-1 Unit Maintenance Manual Volume 1 M548A1 M548A3 Tracked Cargo Carrier Download
Page 684 of 870
TM 9-2350-247-20-1 PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING LUBRICATION INSTRUCTIONS — Continued 0128 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: h. Start, run, and stop vehicle compartment heater (see your -10). During start cycle, check that switches and light bulb work properly. check for increase in blower speed after ignition. i. During operation, check for unusual noises. Check for differences between high and low heat levels. 0128 00-88 Change 1