TM-9-2350-247-20-1 Unit Maintenance Manual Volume 1 M548A1 M548A3 Tracked Cargo Carrier Download
Page 632 of 870
TM 9-2350-247-20-1 PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING LUBRICATION INSTRUCTIONS — Continued 0128 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 21 Semi- Annual Towing Pintle, Tow Hooks and Lifting Eyes a. Check and replace missing or damaged retaining pins and keys (WP 0377 00). Check if towing pintle is securely mounted and operates satisfactorily. 0128 00-36 Change 1