TM-9-2350-247-10 Operator Manual M548A1 M548A3 Tracked Cargo Carrier Download
Page 515 of 640
TM 9-2350-247-10 REMOVE/INSTALL T150 TRACK SHOE 0060 01 THIS WORK PACKAGE COVERS: Removal (page 0060 01-1). Installation (page 0060 01-2). INITIAL SETUP: M a i n t e n a n c e L e v e l Operator T o o l s a n d S p e c i a l T o o l s End Connector Remover (WP 0081 00, Item 32A) Extension, Wrench Handle (WP 0081 00, Item 16A) Hammer, Sledge Hand, 6 lb. or Hammer, 4 lb. (WP 008 1 00, Item 25 or WP 008 2 00) Handle, Socket Wrench, 3/4 inch drive (WP 0081 00, Item 28) Socket, 3/4 inch drive, 1 1/8 inch opening, 6 pt (WP 0081 00, Item 38A) Tool, Track Pin Alignment (2) (WP 0081 00, Item 39A) P e r s o n n e l R e q u i r e d Driver Crew E q u i p m e n t C o n d i t i o n Carrier on level surface Engine stopped (WP 0023 00 or WP 0024 00) REMOVAL 1. Remove spare track from stowage. 2. Break track (WP 0059 01). 3. Remove track shoe from track. a. Remove two bolts from inside and outside end connectors. b. Remove two end connectors from track shoes. 0060 01-1 Change 1