TM-9-2350-247-10 Operator Manual M548A1 M548A3 Tracked Cargo Carrier Download
Page 472 of 640
TM 9-2350-247-10 PREVENTIVE MAINTENANCE CHECKS AND SERVICES — Continued 0057 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 64 Weekly Front Bilge Pump a. Check operation of front bilge pump. Bilge pump inoperable. b. Turn on the master switch and bilge pump switch. c. Check that the front bilge pump light comes on. d. Feel at the bilge pump outlet for a stream of water, if water is in the bilge. 0057 00-104 Change 1