TM-9-2350-247-10 Operator Manual M548A1 M548A3 Tracked Cargo Carrier Download
Page 461 of 640
TM 9-2350-247-10 PREVENTIVE MAINTENANCE CHECKS AND SERVICES — Continued 0057 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: NOTE It takes fifteen minutes for air flow to reach maximum temperature. g. Check for increase in temperature of air flow at each hose outlet. Turn heater control knob at each crew member station to OFF. h. Install air hose on orifice connector assembly at each crew member station. 0057 00-93 Change 1