TM-9-2350-247-10 Operator Manual M548A1 M548A3 Tracked Cargo Carrier Download

Page 436 of 640

TM 9-2350-247-10 PREVENTIVE MAINTENANCE CHECKS AND SERVICES — Continued 0057 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 4) Place a container under open end of hose. Any sign of fuel leak. 5) Raise handle to open toggle valve and drain water and sediment from secondary fuel filter. When clean fuel starts to drain out, push handle down to close toggle valve. 6) Turn MASTER SWITCH OFF. Turn FUEL PUMP switch OFF. 7) When sediment/water is found when draining secondary fuel filter, notify unit maintenance immediately. 0057 00-68 Change 1