TM-9-2350-247-10 Operator Manual M548A1 M548A3 Tracked Cargo Carrier Download

Page 271 of 640

TM 9-2350-247-10 PERFORM PRE-FORDING OPERATIONS — Continued 0042 00 NOTE If there is water in the bilge, you should see it coming out the bilge pump outlet. If you don’t see a flow of water, put your hand over outlets and feel for a flowof air. Only the FWD (forward) bilge light will be illuminated. There is no aft (rear) bilge pump. 5. Run bilge pump to make sure it is working. With carrier on level ground, turn the bilge pump switch to ON. The forward bilge pump indicator light should come on. END OF TASK 0042 00-3/4 blank