TM-9-2350-247-10 Operator Manual M548A1 M548A3 Tracked Cargo Carrier Download
Page 216 of 640
TM 9-2350-247-10 OPERATE MATERIAL HANDLING KIT — Continued 0029 00 c. One hoist beam lock must be loosened to go from a straight position to a slant position or to return to a straight position. Seven beam positions are shown. C A U T I O N When you install the beam, make sure the beam stops are in front of the rear beam support and beam locks are toward the front. 4. To move a beam support. a. Hold beam up by hand. Turn handle of support retaining pin up. Pull pin out. b. Line up support with the hole you want in support bow. c. Install support retaining pin through support and bow. Turn pin handle down to secure pin. 0029 00-2