TM-9-1240-216-34 Maintenance Manual M19 and M24 Persicope Download

Page 81 of 176

TM 9-1240-216-34 3-2. BODY ASSEMBLY INSPECTION UPON RECEIPT (CONT) FRAME 8 Step 1. 2. 3. 4. Procedure Check high voltage receptacle (1) for cap (2) and chain (3). Using 3/16" screwdriver, check that four high voltage receptacle screws (4) are tight. Check two variable resistor’s (focus adjustment ) bushings (5) for caps (6) and chains (7). Check two rubber washers (8) between cap (6) and bushing (5). GO TO FRAME 9 Maintenance Action Replace if damaged or missing. Tighten. Replace if missing or damaged. Replace if damaged or missing. Replace if damaged or missing. Reference Para 4-19 Para 4-19 Para 4-33 Para 4-33 Para 3-2 Cont Vol II 3-11/(3-12 blank)