TM-9-1240-216-34 Maintenance Manual M19 and M24 Persicope Download

Page 21 of 176

TM 9-1240-216-34 CHAPTER 2 CHECKOUT PROCEDURE 2-1. SCOPE Checkout of the M19 and M24 Periscope is done by using the flow chart procedures in this chapter. You must do the checkout procedure from the beginning until a fault symptom is found. When it is, go to the fault symptom index in Chapter 3. After you have corrected the fault, start at the beginning again and do the checkout procedure until the periscope is working correctly. 2-2. CHECKOUT (SHEET 1 OF 6) TEST EQUIPMENT: High voltage power supply, (tank) 0-36 VDC power supply Multimeter test leads High voltage cable PERSONNEL: One REFERENCES: JPG 41C for use of 0-36 VDC power supply TM 10 for installing head assembly (TM 9-2350-215-10 for M60Al, TM 9-2350-257-10 for M60Al Rise, TM 9-2350-260-10 for M60, and TM 9-2350-222-10 for M728) EQUIPMENT CONDITION: Body assembly on work bench with head assembly installed; power disconnected PRELIMINARY PROCEDURES: Assemble power supplies (App B) NOTE All configurations are similar, so only the M24 (new configuration) is pictured in the checkout. Vol I Para 2-1 2-1