TM-9-1240-216-34 Maintenance Manual M19 and M24 Persicope Download

Page 124 of 176

TM 9-1240-216-34 4-21. HIGH VOLTAGE CABLE ASSEMBLY INSTALLATION (CONT) FRAME 2 Step 1. 2. 3. 4. 5. 6. Procedure Put a thin coat of electrical insulating compound on center leg (1) of cable assembly (2) (JPG). Put center leg (1) of cable assembly (2) into receptacle (3) until shoulder on center leg touches receptacle. Make sure that terminal of white wire (4) from electron tube (5) is also connected to terminal (6) of board assembly (7). Using screwdriver, attach terminal A of cable assembly (2) to terminal (6) of board assembly (7) with lockwasher (8) and screw (9). Do steps 3 and 4 again to connect terminal B of cable assembly (2) to terminal of board assembly inside terminal housing (10). Screw receptacle cap (11) onto receptacle (3). NOTE FOLLOW-ON MAINTENANCE Install board assembly (para 4-18, frame 2, step 4). Do checkout procedure (Vol I, para 2-2). END OF TASK Para 4-21 Cont 4-40 Vol II