TB-9-2350-369-20-1 T130E1 to T150F Track Conversion M113 Family Download

Page 12 of 40

TB 9-2350-369-20-1 INTRODUCTION (continued) 0001 00 Not included in kit or 57K4269 but will be needed if being applied to a M981 or M901A1 for mounting the track stowage brackets. NSN NOMENCLATURE CAGEC PART NO. QUANTITY 5305-00-071-2077 Screw 80204 B1821BH050C350N 4 (3) Bulk and Expendable Material. Not Applicable. (4) Parts Disposition. Parts removed and not reinstalled are considered excess for kit application. Excess parts may be reused on another depot overhaul program or otherwise disposed of in accordance with AR 725-50 or local salvage regulations. T130 E1 track removed from vehicle will be inspected and classified IAW TM 9-2530-200-24 dated, March 2006. Refer to Table 1, listed in WP 0002 00. h. Special Tools; Tool Kits; Jigs; Test, Measurement and Diagnostic Equipment (TMDE), and Fixtures Required. Common hand tools (wrenches, sockets, screwdrivers); metal cutting tools (drill bits, taps, saws); and other tools (drills, grinders, shop equipment) are furnished by the maintenance shop/contractor. REQUIRED COMMON TOOLS FOR INSTALLATION NSN NOMENCLATURE CAGEC PART NO. QUANITY 5120-01-240-6040 Crowbar 19207 11655778-5 1 4910-00-253-2478 Grease Gun 19207 10915142 1 5120-00-061-8546 Hammer 2 lb 19207 11677028-3 1 OR 5120-01-399-9254 Hammer 4 lb 1CV05 1435G 1 5120-00-264-3796 Adjustable Wrench 19207 11655778-5 1 5120-00-041-4624 Track Fixture 19207 12253183 2 4240-00-052-3776 Industrial Goggles 19207 - 1 5180-00-177-7033 Gen. Mechanics Tool Kit 19207 - 1 i. Modification Procedures. Refer to Modifications Procedures/Sequencing Work package for compliance. j. Calibration Requirements. No calibration is required of the modified vehicle. k. Weight and Balance Data. Weight and balance are not significantly affected. l. Quality Assurance Requirements. (1) Perform Quality Assurance inspections to verify requirements of paragraph i , which define the minimum inspections to be performed. Documented Quality evidence of inspections performed and compliance with requirements will be accomplished as specified by the maintenance Quality activity. (2) Inspection. (a) In-process Inspection. Perform monitoring-type inspection of processes to assure compliance with requirements. The following items can only be monitored prior to completion of other steps. 1 Ensure track assemblies for T150F track have correct number of track shoes (63 left side, 64 right side M113A2 FOV, M113A3 FOV and OSV; 66 left and right side M548A1/A3). 2 Ensure rework of components is accomplished in their workstations IAW requirements of TB. m. Recording and Reporting of the Modification. Refer to DA Pamphlet 738-750. (1) Marking Equipment. Not applicable. n. Material Change (MC) Number. Not applicable. o. Modification Identification. Not applicable. END OF WORK PACKAGE 0001 00-4