TB-9-2350-368-25 Powerplant Test Stand M113A2 M113A3 M548A1 M548A3 Download
Page 93 of 120
TB 9-2350-368-25 4-21 TESTING ENGINE ONLY DESCRIPTION This task covers: Install (page 4-21). Start (page 4-23). Shutoff (page 4-24). Remove (page 4-24). INITIAL SETUP Tools: General Mechanic's Tool Kit Engine Sling Turbocharger Inlet Shield 4910-01-127-7959 Materials/Parts: Grease Locknuts (2) Personnel Required: Unit Mechanic Helper References: LO 9-2350-247-12 LO 9-2350-261-12 LO 9-2350-277-12 TM 9-2350-247-20-1 TM 9-2350-261-20-1 TM 9-2350-277-20-1 TM 9-2350-366 Series TM 9-2815-205-34 TM 38-260 Equipment Conditions: Engine on maintenance stand or blocks Powerplant test stand blocked INSTALL WARNING • Damaged lifting slings can fail with load. Personnel can be killed or injured. Inspect all slings before use. Do not use damaged slings. • Hanging loads can kill or injure you. Keep away from hanging loads and overhead equipment. Keep hands out of area while engine is being lifted for removal or lowered for installation. NOTE • OSV has A3 engine and TX200-4/4A transmission. • If testing OSV, refer to TM 9-2350-366 series. 1. Attach engine sling to lifting brackets and lift engine. Have helper assist. 2. Attach appropriate engine sling to lifting device of at least 2,000 pounds (908 kg) capacity.