TB-9-2350-368-25 Powerplant Test Stand M113A2 M113A3 M548A1 M548A3 Download

Page 78 of 120

TB 9-2350-368-25 4-6 6. Fabricate and connect top and bottom radiator hoses as needed. 7. Connect bleeder hose assembly (8) between elbow (9) on flange elbow (deaeration elbow) (10) and elbow (11) on thermostat housing (12) with two clamps (13) (Figure 2-17). See Figure 4-3. Figure 4-3. Bleeder Hose Assembly 8. Fill radiator and engine with water. Coolant is not necessary for testing. 9. Check all fluid levels and fill as necessary. Refer to LO 9-2350-277-12 or LO 9-2350-247-12. WARNING The turbocharger can grind off a part or all of your hand. Place a screen or some type of guard over turbocharger intake manifold if air cleaner system is not used. Any objects that are ingested into the intake will damage the engine.