TB-9-2350-368-25 Powerplant Test Stand M113A2 M113A3 M548A1 M548A3 Download

Page 75 of 120

TB 9-2350-368-25 4-3 Section II. MAINTENANCE TESTING M113A3/M548A3 OSV POWERPLANT DESCRIPTION This task covers: Install (page 4-3). Start (page 4-10). Stop (page 4-12). Remove (page 4-12). INITIAL SETUP Tools: General Mechanic's Tool Kit Powerplant Sling Turbocharger Inlet Shield 4910-01-127-7959 Materials/Parts: Grease Locknuts (2) Exhaust Elbow Suitable Container Personnel Required: Unit Mechanic Helper References: LO 9-2350-247-12 LO 9-2350-277-12 TM 9-2350-247 Series TM 9-2350-277 Series TM 9-2350-366 Series TM 9-2815-205-34 TM 38-260 Equipment Conditions: Powerplant on Blocks Powerplant Test Stand blocked INSTALL WARNING Damaged lifting slings can fail with load. Personnel can be killed or injured. Inspect all slings before use. Do not use damaged slings. Hanging loads can kill or injure you. Keep away from hanging loads and overhead equipment. Keep hands out of area while powerplant is being lifted for removal or lowered for installation. NOTE STE-ICE transducers and harness are only on the M113A3 FOV powerplants. OSV has A3 engine and TX200-4/4A transmission. If testing OSV, refer to TM 9-2350-366 series.