TB-9-2350-368-25 Powerplant Test Stand M113A2 M113A3 M548A1 M548A3 Download

Page 70 of 120

TB 9-2350-368-25 3-6 11. Install transmission high temp indicator light (13) in instrument panel. 12. Install transmission low oil pressure indicator light (14) in instrument panel. 13. Install fuel gage (15) in instrument panel. 14. Install starter switch (16) in instrument panel. 15. Install preheat switch (17) in instrument panel. 16. Install tachometer (18) in instrument panel only if space is available, otherwise the tachometer should be connected to tachometer cable and hand held. 17. Install starter relay (19) in instrument panel. 18. Install fabricated transmission controller (20) in instrument panel or vehicle transmission controller (21) with four lockwashers (22) and four screws (23). 19. Install a 16 gage wire from Pin K at pack accessory cable on cart side. Run wire into instrument panel and install glow plug indicator light assembly (24) in face of instrument panel. Connect wire to light and connect a short piece of wire from other terminal to panel ground. 20. Install fuel switch (25) in instrument panel. 21. Install connectors (26 and 27) and gaskets in instrument panel.