TB-9-2350-368-25 Powerplant Test Stand M113A2 M113A3 M548A1 M548A3 Download
Page 53 of 120
TB 9-2350-368-25 2-39 g. Starter Cable (M113A3/M548A3) Bill Of Materials Item Nomenclature Part Number NSN Qty 1 Electrical Plug Connector MS3456W32-1P 5935-01-181-8997 1 2 Lug Terminal MS20659-135 5940-00-155-5001 2 3 Electrical Wire M13486/1-14 6145-00-705-6674 A/R 4 Electrical Insulation Tape 07099 - MS70T09-S 5970-00-955-9976 A/R Electrical Insulation Sleeving 78286-S6132- 61003-9 5970-00-004-4056 A/R 5 Band Marker M43436/1-1 9905-00-752-4649 4 1. Measure from the M113A3 engine harness to power bus bar. 2. Connect two AWG 1/0 electrical leads (3) measured in step 1, to electrical plug connector (1). 3. Label leads (3), using band markers (5), from pin E, 6; and pin B, 6A. 4. Install lug terminal (2) on each lead (3). 5. Install electrical insulation tape/sleeving (4) on both leads (3). See Figure 2-24. Figure 2-24. Starter Cable (M113A3/M548A3)