TB 9-2350-368-25 2-38 f. Transmission Cable Bill Of Materials Item Nomenclature Part Number NSN Qty 1 Electrical Plug Connector MS3100R24-7S 5935-00-853-3135 1 2 Electrical Wire M13486/1-11 6145-00-538-8219 A/R 3 Electrical Insulation Tape 07099 - MS70T09-S 5970-00-955-9976 A/R Electrical Insulation Sleeving 78286-S6132- 61003-9 5970-00-004-4056 A/R 4 Band Marker M43436/1-1 9905-00-752-4649 14 1. Measure from the M113A3 engine harness to instrument panel/box. 2. Connect seven AWG 4 electrical leads (2) measured in step 1, to electrical plug connector (1). 3. Label leads (2), using band markers (4), from pin A, 364; pin B, 363; pin C, 362; pin D, 361; pin E, 360; pin F, 359; and pin G, 358. 4. Install electrical insulation tape/sleeving (3) on all leads (2). See Figure 2-23. Figure 2-23. Transmission Cable