TB 9-2350-368-25 2-37 NOTE Steps 6 through 13 are only for fabricating an adapter to connect the M113A3 regulator cable to the M548A3 powerplant. 6. Cut one AWG 0 electrical lead (16) as needed. 7. Connect AWG 0 electrical lead (16) to pin E of connector (9). Label this lead circuit 6. 8. Splice two AWG 4 electrical leads (17) into the AWG 0 lead (16). Label these leads circuit 2 and circuit 2A. 9. Splice AWG 14 electrical lead (18) into the AWG 0 lead (16). Label this lead circuit 567. 10. Connect AWG 0 electrical lead (16) to pin A of connector (13), bushing (14), and nut (15). 11. Connect two AWG 4 electrical leads (17) (pins A and C) and one AWG 14 electrical lead (18) (pin E) to connector (10), bushing (11), and nut (12). 12. Install electrical insulation tape/sleeving (19) on all leads. 13. Label this harness adapter, M548A3 only. Figure 2-22. Regulator Cable (Four Leads) (M113A2/M113A3/M548A1 Only)